Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

HPE0-S60 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

HPE0-S60 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Delta - HPE Compute Solutions
  • Last Update: May 18, 2024
  • Questions and Answers: 79
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

HPE0-S60 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

HPE0-S60 Practice Exam Questions with Answers Delta - HPE Compute Solutions Certification

Question # 6

Your customer has experience with utilization sampling for HPE Virtual Connect SE 100 Gb F32 Module for HPE Synergy. They have recently purchased HPE VC FC modules.

What must you be aware of regarding utilization sampling for the new modules?

A.

Utilization sampling for HPE VC FC modules must be enabled manually using CLI.

B.

For HPE VC FC modules, utilization sampling is always enabled and cannot be disabled

C.

For HPE VC FC modules, utilization sampling can be enabled once appropriate license is applied

D.

Utilization sampling works the same way tor any type of HPE Synergy interconnect modules

Full Access
Question # 7

Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has an appropriate storage controller Installed and two 12Gb SAS switches installed in the first fabric.

The customer reports that compute nodes cannot access the storage module. What should you verify first when troubleshooting this problem?

A.

If the D3940 module is imported in managed state that allows volume provisioning.

B.

If there Is a logical interconnect created based on the 12Gb SAS switches.

C.

If the D3940 storage module is property licensed through HPE OneView interface.

D.

If there is at least one ISCSI network configured that will provide access to the module.

Full Access
Question # 8

Which statement about manual orchestration during the firmware update is true?

A.

It is supported only for logical enclosures with at least three frames

B.

It provides an ability to select and update one side of the Interconnect topology at a time

C.

It provides the ability to install an older firmware version than currently Installed In the interconnect

D.

It allows all the interconnect modules to be activated manually at the same time.

Full Access
Question # 9

You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.

Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

A.

App Volume Set

B.

Storage Container

C.

Virtual Volume Set

D.

virtual Volume

Full Access
Question # 10

Your customer manages HPE Synergy using HPE OneView. For one of its projects, the company purchased 50 HPE.

ProLiant DK385 Gen10 Plus v2. They plan to manage the new systems using HPE OneView as well.

What should the customer do to manage rack system using HPE OneView?

A.

add the rack system to the HPE OneView instance used to manage HPE Synergy to centralize management of all systems.

B.

connect the rack system to an IPDU and add the IPDU to the HPE. OneView instance that is used for HPE synergy management.

C.

Deploy HPE OneView Global Dashboard and add the rack systems there, as AMD systems are not directly in HPE OneView.

D.

Deploy an HPE OneView virtual appliance, and, after configuration, use it to manage only the rack systems.

Full Access
Question # 11

After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.

Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

HPE0-S60 question answer

Full Access
Question # 12

Your customer needs to move an application from an HPE Synergy 480 Gen10 Compute Module to an HPE Synergy 660 Gen 10 Compute Module. The 480 has a switch that has been manually zoned outside of HPE OneView.

What must the customer do before migrating the application?

A.

Migrate the application to a Logical JBOD and connect it to the new server

B.

Copy the server profile and assign the clone to the new hardware

C.

Edit the server profile and change server hardware type

D.

Create a new server profile template and apply to the new hardware

Full Access
Question # 13

An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.

Click the parameter that the customer should configure within an uplink set to meet this requirement

HPE0-S60 question answer

Full Access
Question # 14

Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.

Which procedures should De performed during the expansion process? (Select two.)

A.

Create a new logical interconnect group and enclosure group for two frames setup

B.

Create a new logical enclosure based on both HPE Synergy frames.

C.

Re-parent an existing enclosure group to the new logical interconnect group.

D.

Modify an existing logical interconnect to include second HPE Synergy frame.

E.

Move one of the master modules to the appropriate interconnect bay in the second frame.

Full Access
Question # 15

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

A.

Existing 2-port FLM modules must be replaced with 4-port FLM modules

B.

A management ring can contain mixed frame link module configurations

C.

A management ring with mixed FLM modules cannot have more than 12 frames

D.

Mixing different FLM modules is allowed if all of them have the same firmware version

Full Access
Question # 16

Your customer is implementing an HPE Synergy solution based on three frames.

Click each of the ports that can be used to connect satellite modules.

HPE0-S60 question answer

Full Access
Question # 17

What is a limitation when creating a server profile?

A.

BIOS settings can be changed only when UEFI optimized is selected as boot mode

B.

ILO management is limited to the integration with Active Directory or LDAP

C.

Administrator cannot define more than 8 connections within a server profile

D.

It is not possible to create shared volumes on demand through a server profile

Full Access
Question # 18

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

A.

Disable deduplication for this volume at the array level

B.

Remove the offline disks using array management tools

C.

Install and configure MPIO on me Windows system

D.

Remove the offline disks using Windows Disk Management

Full Access
Question # 19

Which statement about HPE Superdome Flex 280 is true?

A.

It supports 2 to 8 sockets in 2-socket increments.

B.

it cannot be managed using HPE OneView.

C.

It must be equipped with at least 768 GB of memory.

D.

It can support up to two nPars with an external RMC.

Full Access
Question # 20

Which statement about a new HPE SimpliVity deployment is true?

A.

New HPE SimpliVity deployments give customer flexible choice of hypervisor

B.

All new HPE SimpliVity models are based on AMD CPUs

C.

All new HPE SimpliVity models support deduplication and compression

D.

New HPE SimpliVity deployments are licensed per node not per physical socket

Full Access
Question # 21

You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.

Put the steps to achieve this goal into the coned order in the answer area on the right.

HPE0-S60 question answer

Full Access
Question # 22

Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61

Which statement about this update process is true?

A.

To update to 6,1, the customer has to first update to 6 0, which is a milestone edition.

B.

The customer can update directly to 6,1, but HPE OneView downtime will be longer.

C.

Before updating to 6,1, customer should increase memory size on the HPE Composer.

D.

The customer must check the HPE Composer version, as 61 is supported only with HPE Composer2.

Full Access
Question # 23

Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards

They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration

- two HPE Synergy Virtual Connect SE 32Gb FC Modules

- two HPE Synergy 20Gb interconnect Link Modules

- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards

Which statement about the planned configuration change is true?

A.

Four compute modules must be moved to the second frame to balance the configuration

B.

The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option

C.

A license for an extended logical enclosure must be added to HPE OneView through GUI

D.

The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked

Full Access