Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

LEED-AP-ID+C PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

LEED-AP-ID+C PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
  • Last Update: May 18, 2024
  • Questions and Answers: 100
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

LEED-AP-ID+C Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

LEED-AP-ID+C Practice Exam Questions with Answers LEED AP Interior Design + Construction (LEED AP ID+C) V4 Certification

Question # 6

Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

A.

Base-building chiller specifications

B.

CFC-free refrigerants in tenant cooling units

C.

Temperature monitoring of building cooling water

D.

ENERGY STAR® compliant cooling units with low CFCs

Full Access
Question # 7

A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning. Who may be appointed as the Commissioning Authority (CxA) for the project?

A.

An employee of the architecture or engineering firm but not a member of the design team

B.

A sub-consultant to the architecture or engineering firm but not a member of the design team

C.

A subcontractor of the general contractor or construction manager but not a member of the construction team

D.

An employee or subcontractor of the general contractor or construction manager and a member of the construction team

Full Access
Question # 8

Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?

A.

An existing bus stop located 1/4 mi. (0.40 km) away from the LEED project's main entrance

B.

An existing restaurant that is 3/4 mi. (1.20 km) away from the LEED project's main entrance

C.

An existing fast-food restaurant with no drive-in service located 1/8 mi. (0.20 km) away from the LEED project's main entrance

D.

A planned school that will be occupied within 18 months of the date of the LEED project's initial certificate of occupancy and is located 1/4 mi. (0.40 km) away from the LEED project's main entrance

Full Access
Question # 9

In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?

A.

Switching from municipally supplied potable water to potable well water on-site

B.

Reducing irrigation needs by planting native species and drought-tolerant species

C.

Reducing potable water supply by limiting occupant access to drinking fountains and public restrooms

D.

Reducing process water demand by assessing kitchen and laundry equipment selection and operational. schedules

Full Access
Question # 10

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

A.

Included in the numerator only

B.

Included in the denominator only

C.

Included in both the numerator and denominator

D.

Excluded from both the numerator and denominator

Full Access
Question # 11

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

A.

owner

B.

architect

C.

contractor

D.

project manager

Full Access
Question # 12

Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Building Level Energy Metering

Full Access
Question # 13

For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the

A.

Corrective Action Plan

B.

Thermal Comfort Survey

C.

functional performance tests

D.

mechanical drawings showing all equipment installed

Full Access
Question # 14

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design

C.

developing the LEED Scorecard

D.

implementing the Commissioning Plan

Full Access
Question # 15

Drywall is purchased from a local manufacturer for a total materials cost of $10,000 USD. The specification of the drywall is:

· 5% of the product is comprised of post-consumer recycled paper sourced from a pulp mill 25 mi. (40 km) away;

· 50% of the product is post-consumer recycled gypsum attained from a facility 30 mi. (48 km) away;

· new gypsum is extracted from a mine 175 mi. (282 km) away.

What is the contributing value of the drywall to Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

A.

$5,500 USD

B.

$9,750 USD

C.

$11,000 USD

D.

$19,500 USD

Full Access
Question # 16

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Full Access
Question # 17

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Full Access
Question # 18

A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Quality Views

C.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

D.

Energy and Atmosphere Credit, Fundamental Commissioning and Verification

Full Access
Question # 19

Which standard reference can be used to find minimum ventilation rates?

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2010

C.

SCAQMD Rule 1168

D.

ASHRAE 62.1-2010

Full Access
Question # 20

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Full Access
Question # 21

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

A.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Full Access
Question # 22

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Full Access
Question # 23

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Full Access
Question # 24

For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?

A.

The project administrator

B.

A LEED AP without specialty

C.

The LEED AP with any specialty

D.

The LEED AP with ID+C specialty

Full Access
Question # 25

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Commercial dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Commercial clothes washers and coffee makers

Full Access
Question # 26

Which of the following can be considered pre-consumer recycled content?

A.

Aluminum cans used to make sheet metal

B.

Plastic bottles that are used to create upholstery fabric

C.

Sawdust from a lumber mill used to make composite board

D.

Glass manufacturing scraps (culls) that are used to create new glass

Full Access
Question # 27

A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?

A.

Zero additional points are available under the Location and Transportation category

B.

Two additional points are available only in Location and Transportation Reduced Parking Footprint

C.

Eight additional points are available under the Location and Transportation category

D.

18 additional points are available under the Location and Transportation category

Full Access
Question # 28

A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?

A.

Regional Priority Credit, Optimize Energy Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Full Access
Question # 29

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Full Access
Question # 30

What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

A.

Choosing energy efficient systems

B.

Conducting a simple box energy model

C.

Implementing passive design strategies

D.

Performing commissioning of energy systems

Full Access